Permits Index
1
Permits, 24 months
4 on record
0
Roofing permits
Aug 27, 2026
Last permit issued
4
Addresses with a page

Heating and cooling: 1 permit

From Aug 27, 2026 to Aug 27, 2026. Fewer than 5 heating and cooling permits since October 1, 2024 carry a declared value, so no range is computed; the rows are below. Filed by AK Construction Ent. Inc..

IssuedWorkBuildingDeclared valueContractor as filedPermit
Aug 27, 2026Sub-Trades Only: GAS-X/P,FAU-R,EXFAN/M,EXFAN/E,LITE-R,LITE-N,R/SW-R,RPIP-G/P,AC-E,SUBPNL,AC,DUCT/M,RWIRE1,WSISingle-Family—AK Construction Ent. Inc.2026-135167-RS

Water heater: 1 permit

From Oct 5, 2020 to Oct 5, 2020. Fewer than 5 water heater permits since October 1, 2024 carry a declared value, so no range is computed; the rows are below. Filed by 5 POINT PLUMBING CORP..

IssuedWorkBuildingDeclared valueContractor as filedPermit
Oct 5, 2020Sub-Trades Only: Water Heater, Replacement - SFRSingle-Family—5 POINT PLUMBING CORP.2020-131804-RS

Electrical: 1 permit

From Jan 28, 2019 to Jan 28, 2019. Fewer than 5 electrical permits since October 1, 2024 carry a declared value, so no range is computed; the rows are below. Filed by DALCON INC.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Jan 28, 2019Sub-Trades Only: ELECTRICAL SERVICESingle-Family—DALCON INC2019-103436-RS

Solar: 1 permit

From Aug 25, 2017 to Aug 25, 2017. Fewer than 5 solar permits since October 1, 2024 carry a declared value, so no range is computed; the rows are below. Filed by TESLA ENERGY OPERATIONS.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Aug 25, 2017Additions/Alterations: + BATTERY STORAGE SYSTEMSingle-Family—TESLA ENERGY OPERATIONS2017-032488-RS

Addresses on this street with a page

Source

City of San José open data, pulled nightly. As of October 1, 2026. Storm dates touching this street will appear here once the hail record is attached.