Bethany Lake Blvd, Allen: permits on record
11 home-service permits on record on Bethany Lake Blvd since March 7, 2023, 7 of them since October 1, 2024, at 11 addresses. Home-service permits only (roofing, heating and cooling, solar, electrical, plumbing, water heaters); other building permits are kept in the record and not shown. Permits are listed without house numbers; each address has its own page below.
Roofing: 4 permits
From Jan 15, 2025 to Sep 17, 2025. Fewer than 5 roofing permits since October 1, 2024 carry a declared value, so no range is computed; the rows are below. Filed by FIREMAN'S ROOFING AND GENERAL CONTRACTORS, NOT LISTED, AMAZING FINISH ROOFING AND CONSTRUCTION, TOUCHSTONE ROOFING, LLC.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Sep 17, 2025 | Roof/Re-Roof: RE-ROOF PER CAL SEPTEMBER 2025 PERMIT REPORT | Residential | — | FIREMAN'S ROOFING AND GENERAL CONTRACTORS | 25-6380 |
| Jun 4, 2025 | Roof/Re-Roof: RE-ROOF PER CAL JUNE 2025 PERMIT REPORT | Residential | — | NOT LISTED | 25-3691 |
| May 14, 2025 | Roof/Re-Roof: RE-ROOF PER CAL MAY 2025 PERMIT REPORT | Residential | — | AMAZING FINISH ROOFING AND CONSTRUCTION | 25-2391 |
| Jan 15, 2025 | Roof/Re-Roof: RE-ROOF PER CAL JANUARY 2025 PERMIT REPORT | Residential | — | TOUCHSTONE ROOFING, LLC | 24-5042 |
Heating and cooling: 4 permits
From Jun 30, 2023 to Aug 17, 2026. Fewer than 5 heating and cooling permits since October 1, 2024 carry a declared value, so no range is computed; the rows are below. Filed by NOT GIVEN (3), NOT LISTED.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Aug 17, 2026 | Miscellaneous: HVAC-INSTALL FULL SYSTEM PER CAL AUG 2026 PERMIT REPORT | Residential | — | NOT GIVEN | 26-005139 |
| May 22, 2026 | Miscellaneous: HVAC-4 TON DELUXE EVAP COIL PER CAL MAY 2026 PERMIT REPORT | Residential | — | NOT GIVEN | 26-002712 |
| Jul 11, 2025 | Miscellaneous: REMOVE AND REPLACE 1 FULL HVAC SYSTEM, PER CAL JULY 2025 PERMIT REPORT | Residential | — | NOT GIVEN | 25-004668 |
| Jun 30, 2023 | Miscellaneous: HVAC PER CAL JUNE 2023 PERMIT REPORT | Residential | — | NOT LISTED | 23-004909 |
Solar: 3 permits
From Mar 7, 2023 to Aug 4, 2023. Fewer than 5 solar permits since October 1, 2024 carry a declared value, so no range is computed; the rows are below. Filed by NOT LISTED, ADT SOLAR, TRISMART SOLAR.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Aug 4, 2023 | Solar Energy Device: SOLAR PANELS PER CAL AUGUST 2023 PERMIT REPORT | Residential | $12,871 | NOT LISTED | 23-006345 |
| Jun 7, 2023 | Solar Energy Device: SOLAR | Residential | $20,555 | ADT SOLAR | 23-002375 |
| Mar 7, 2023 | Solar Energy Device: SOLAR, PERMIT NUMBER PER CAL FEB 2023 PERMIT REPORT | Residential | $25,704 | TRISMART SOLAR | 23-7211 |
Addresses on this street with a page
Source
Collin Central Appraisal District building permits, Texas open data, pulled nightly. As of October 1, 2026. Storm dates touching this street will appear here once the hail record is attached.