Permits, 24 months
7 on record
1
Roofing permits
Aug 18, 2026
Last permit issued
7
Addresses with a page

Roofing: 1 permit

From Jun 26, 2025 to Jun 26, 2025. Fewer than 5 roofing permits since October 1, 2024 carry a declared value, so no range is computed; the rows are below. Filed by NOT LISTED.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Jun 26, 2025Roof/Re-Roof: RE-ROOF PER CAL JUNE 2025 PERMIT REPORTResidential—NOT LISTED25-4300

Heating and cooling: 5 permits

From Aug 28, 2023 to Jul 1, 2026. Fewer than 5 heating and cooling permits since October 1, 2024 carry a declared value, so no range is computed; the rows are below. Filed by NOT GIVEN (3), NOT LISTED (2).

IssuedWorkBuildingDeclared valueContractor as filedPermit
Jul 1, 2026Miscellaneous: HVAC-REPLACEMENT OF EXISTING 4 TON AC SYSTEM PER CAL JULY 2026 PERMIT REPORTResidential—NOT GIVEN26-004013
Apr 13, 2026Miscellaneous: HVAC-4 TON BASE HORIZONTAL GAS SYSTEM PER CAL APR 2026 PERMIT REPORTResidential—NOT GIVEN26-002257
Jul 14, 2025Miscellaneous: REPLACE 4 TON STANDARD HORIZONTAL GAS HVAC SYSTEM. PER CAL JULY 2025 PERMIT REPORTResidential—NOT GIVEN25-004705
Jun 14, 2024Miscellaneous: HVAC PER CAL JUNE 2024 PERMIT REPORTResidential$20,398NOT LISTED24-4169
Aug 28, 2023Miscellaneous: HVAC PER CAL AUGUST 2023 PERMIT REPORTResidential—NOT LISTED23-007887

Solar: 1 permit

From Aug 18, 2026 to Aug 18, 2026. Fewer than 5 solar permits since October 1, 2024 carry a declared value, so no range is computed; the rows are below. Filed by NOT GIVEN.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Aug 18, 2026Solar Energy Device: SYSTEM W/ 8 MODULES AND 1 BATTERY PER CAL AUG 2026 PERMIT REPORTResidential$29,839NOT GIVEN26-005174

Addresses on this street with a page

Source

Collin Central Appraisal District building permits, Texas open data, pulled nightly. As of October 1, 2026. Storm dates touching this street will appear here once the hail record is attached.