Permits Index

Home-service permits on record at this address

IssuedWorkTradeDeclared valueContractor as filedStatusPermit
Nov 15, 2022otc alterations permit: apt #5: bathroom remodel requiring electrical , building, and plumbing modifications, adding neew vanity after full demo along with drywall , tile, shower etc. 2/f unit 0Plumbing$20,000—Finaled Jan 6, 2023202211146483
Nov 14, 2022otc alterations permit: 1/f-unit 2: full bathroom remodel, full demo floor/drywall, electrical, plumbing, new tile, shower, vanity, & toiletPlumbing$20,000—Finaled Jan 20, 2023202211146469

On 20th Ave

424 permits on record on 20th Ave.

TradePermitsSince Oct 7, 2024Median declaredRangeLast
Roofing20233$15,000$9,200–$39,407May 26, 2026
Electrical904—under 5Sep 12, 2025
Plumbing6110$70,500$1–$212,500Jun 30, 2026
Heating and cooling546$50,000$12,409–$253,500Sep 14, 2026
Water heater161—under 5Oct 14, 2025
Solar11—under 5Aug 11, 2026

Roof replacement cost in San Francisco

Across 5,870 one- and two-family reroof permits since October 7, 2024, most declared values run from $7,650 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,800 and $21,797. The lowest on record is $1 and the highest $4,315,170. Every permit behind that range.

Furnace, heat pump or air conditioner replacement cost in San Francisco

Across 294 one- and two-family heating and cooling permits since October 7, 2024, most declared values run from $31 to $228,385 (the middle 80%); the median is $25,998 and half fall between $5,125 and $120,000. The lowest on record is $1 and the highest $1,600,000. Every permit behind that range.

Source

San Francisco Department of Building Inspection, via DataSF, pulled nightly; the assessor roll for the property fields. As of October 7, 2026. Owner names are not shown on any page.