Sep 2, 2026otc alterations permit: 10th fl, mep submittal to support approved arch permit. new hvac duct work and lighting for new office rooms. ref pa 202608216997Heating and cooling$28,800—issued202609027602
May 6, 2026otc alterations permit: revision to pa 202603107218 to add electrical and illumination to sign a as changes to sign size , location or attachment methodElectrical$1,200—issued202605010458
Apr 21, 2026otc alterations permit: ref bpa:202512313114 - adjust low side air distribution, new cooling, vav box, new transfer air, light fixtures, circuits/controls, power and signal devices new plumbingPlumbing$250,000—Finaled Jul 24, 2026202603248182
Apr 3, 2026otc alterations permit: 10th floor. electrical new power and signal device throughout the space. new 2022 title 24 compliant lighting and controls. ref 202507110614Electrical$20,000—Finaled Jul 24, 2026202603258254
Mar 27, 2026otc alterations permit: revision to bp# 202310058107; seismic bracing for 4000a, 1600a & 800a, electrical bus ductHeating and cooling$1—issued202603258253
Mar 13, 2026otc alterations permit: revision to pa #202503071771: revise scope of mechanical work. remove hvac ducting in surrounding unoccupied spaces in preperation of future projects. revise plan of busway crossing the corridor, show elevation with available clearanceHeating and cooling$1—issued202602135930
Feb 25, 2026otc alterations permit: the interior scope consists of demolishing the existing 2nd floor shaft and duct work and infilling the associated deck openingHeating and cooling$55,000—Finaled Sep 11, 2026202601204116
Feb 17, 2026otc alterations permit: 1st floor: new fidelity investment center. new partitions and office, new ducts, power, & lightingHeating and cooling$1,134,601—issued202512192291
Feb 11, 2026otc alterations permit: fire alarm t.i. on 1st flr. add 6 speaker strobes. 2 speakers, 3 duct detectors. 3 control relays for air handling unit . 202508012119Heating and cooling$8,000—Finaled May 1, 2026202602105630
Feb 4, 2026otc alterations permit: fire alarm t.i. -basement level. add 5 speaker strobes. 4 duct detectors for heat pump w/relays to av shutdown. ref# 202509306349Heating and cooling$7,000—Finaled May 20, 2026202602045214
Dec 12, 2025otc alterations permit: 1st floor: demolition of existing cafe including commercial kitchen equipment and associated plumbing and mechanical equipment, construction of new building amenity space conference counter inlcuding non-structural partitions, lighting, millwork, and finishesPlumbing$547,894—Finaled Aug 20, 2026202508012119
Sep 12, 2025otc alterations permit: 10th fl: demo of some ceiling height partitions. construction of full ht partitions, doors, glazing & finishes. associated electrical power/lighting distribution. mep deferred. associated life safety system chargesElectrical$900,000—Finaled Jul 24, 2026202507110614
Jul 7, 2025otc alterations permit: basement - fire alarm ti add 2 speaker strobes; add 6 duct detector w/relays for fsd; 2 area smoke detectors; 2 control relays for fsd. ref pa 202310058107Heating and cooling$24,238—Finaled Jul 16, 2026202505065910
Apr 30, 2025otc alterations permit: 6/f: deferred mechanical and electrical for t.i permit 202503071767Electrical$58,000—Finaled Oct 3, 2025202504305504
Mar 21, 2025otc alterations permit: basement: to relocate and modify existing mains and heads to accommodate new electrical room. ref permit 202310058107Electrical$22,000—Finaled Jun 4, 2025202503212753
Dec 10, 2024otc alterations permit: 2/fl-demo non structural partitons. on level 02.appx 12050sf additionally demo flooring, plumbing, millwork & equipment. new construction. elevator lobby area and structural slab infill. tiles to be replaced on ceilingPlumbing$196,000—Finaled Sep 5, 2025202411215476
Jul 17, 2024otc alterations permit: suite 725: plans deferred of mech/electrical for t.i. pa 202405031370. no change in occupancyElectrical$400,000—Finaled Oct 10, 2024202407116325
May 13, 2024otc alterations permit: 7th fl suite 725 demolition and construction of non structural partitions, ceilings, lighting and finishes. no change in occupancy or use. deferred submittals includes mechanical, electrical, plumbing, life safety and sprinklersPlumbing$455,520—Finaled Oct 10, 2024202405031370
Dec 14, 2023additions alterations or repairs: switchgear replacement project that includes a new base building main electrical room within an exercise room & limited accessibility upgrades to the restrooms serving the area of remodelElectrical$190,000—issued202310058107
Nov 14, 2023otc alterations permit: basement & 2nd fl - removal of walls, flooring, ceiling, electrical, plumbing, millwork, equipment to leave the tenant space ready to show to possible tenants. interior demo only - ab-017Plumbing$618,280—Finaled Apr 22, 2024202311060270
May 4, 2023otc alterations permit: 6/f ste 600: deferred submittal of mechanical and electrical work for t.i. ref pa# 202212138185Electrical$125,000—Finaled Dec 11, 2023202304206093
Jan 18, 2023ReRoof: 6/f: add pendants. ref bpa#202212158367Roofing$2,731—Finaled Jan 27, 2023202301180289
Dec 29, 2022otc alterations permit: mechnical and electrical portion of ti on the 6th fl ref pa 2022-1215-8367Electrical$176,000—Finaled Aug 3, 2023202212299348
Sep 16, 2022otc alterations permit: 13th fl: new electrical for spec suite remodel. revise & reuse circuits as needed. includes lighting, also includes mechanical for revised zones. title-24 for lighting & mechanical included. fire alarm submitted separately. ref pa# 202202097620Electrical$50,000—Finaled May 10, 2023202209061892
Sep 16, 2022otc alterations permit: 1st fl: common restrooms: new electrical & lighting. existing circuits to be revised. invlices title 24 for lighting. ref pa# 202203079319Electrical$20,000—Finaled Nov 17, 2022202209061890
Mar 21, 2022otc alterations permit: 9th floor: electrical work for t.i. ref pa# 202201276764Electrical$1—Finaled Sep 30, 2022202203170246
Oct 26, 2021otc alterations permit: 14th floor. deferred submittal for modificication of e hvac system, lighting and power for tenant improvements. ref arch pa 2021-0819-6702Heating and cooling$56,575—Finaled Feb 3, 2022202110200889
Aug 4, 2021otc alterations permit: t.i. on 1st fl. add duct detectors w/ control relays for fsds & control relay for vfd shutdown ref pa# 2021-0528-1297Heating and cooling$2,800—Finaled Nov 10, 2021202108045757
Apr 10, 2019otc alterations permit: 12th fl: revision of t-24 pages to previously approved electrical pages. ref pa #201902132813, 201903155344Electrical$1—Finaled Aug 26, 2019201904107577
Apr 3, 2019otc alterations permit: 12th floor m.e.p: drawing to support approved architecturals. demo of existing duct work and diffusers relocation of existing vav and relocation of thermostat. ref bpa# 2019-0213-2813Heating and cooling$40,000—Finaled Sep 11, 2019201903155344
Apr 1, 2019otc alterations permit: basement - electrical work for tenant improvement. ref pa 2018-1212-8062Electrical$2,500—issued201903286518
Mar 27, 2019otc alterations permit: roof deck structural calculations for pergola ref pa 2019-0311-4919Roofing$15,000—Finaled Dec 1, 2020201903114954
Mar 13, 2019otc alterations permit: roof deck - revision to approved permits to construct roof deck. structural revision only. add pedastal, furniture and light pole. ref pa #201808137152Roofing$35,000—Finaled Dec 2, 2020201903114919
Dec 6, 2018otc alterations permit: fire alarm t.i. on roof deck, add 2 weather proof speaker strobe & 1 control relay for music shutdownRoofing$1,600—Finaled Jan 25, 2021201812047437
Nov 26, 2018otc alterations permit: electrical work for ti on 9th flr ref 201810112910Electrical$5,000—issued201811206391
Nov 16, 2018otc alterations permit: roof revision to 201808137152. changes to various roof deck elementsRoofing$1—Finaled Dec 2, 2020201811166089
Sep 21, 2018otc alterations permit: roof top: relocate 2 fire sprinklers and plug 1 sprinkler outlet to conform with new wall/ceiling layout per t.i. #201808137152 job# 18-723Roofing$992—Finaled Oct 24, 2018201809211033
Aug 15, 2018otc alterations permit: new roof deck. new low wall partitions, new pergolas structural, lighting and millwork. assembly area a-3. maher n/aRoofing$315,000—Finaled Dec 7, 2020201808137152
May 1, 2018otc alterations permit: fire alarm ti on 13th fl - provide 2 smoke detectors, 2 control relay for hvac shutdown & 47 speaker strobes. ref pa 2018-0131-9978; n/a maherHeating and cooling$25,000—Finaled Jun 21, 2018201804196789
Mar 27, 2018otc alterations permit: addition of perimeter railing extension for roof. maher naRoofing$50,000—Finaled Jun 7, 2019201802070602
Feb 27, 2018otc alterations permit: 14th flr - new stair connecting 14th floor to roof. ref 201801319972 maher naRoofing$175,000—Finaled Aug 22, 2019201802211831
Jan 17, 2018otc alterations permit: revision to pa 2016-0212-9534 changes to the elevator lobby doors on level 14 frm glass doors to solid core wood doors; change to the infill of the opening to the roof from previously permitted metal stud temporary floor to an open communicating atrium as permitted per cbc 712-1.9Roofing$1—issued201712196921
Nov 30, 2017additions alterations or repairs: revision to 201602129534. new non combustible private roof deck with pedestal pavers, glass and metal reailings. structural improvement atthe undersid of roof slab, new steel interior stair, elevator from 14th fl. new elevator machine room 13th fl. elec/plumbing stubouts. 4250 sf areaRoofing$1,200,000—Finaled Jun 4, 2019201612225779
Sep 29, 2017otc alterations permit: electrical for ti on 6th fl to install new mechanical systems, lighting, power. see 201707273125 for reference maher not reqElectrical$34,510—Finaled Nov 9, 2017201709279742
Jul 26, 2017otc alterations permit: 11/f elevator lobby- mechanical, electrical t-24 to relocate and replace equipment for t.i. pa#201706169629. n/a ordinance #155-13Electrical$30,000—Finaled Oct 2, 2017201707202524
Jun 22, 2017otc alterations permit: 11th floor suite 1150 fire alarm ti - add 13 ceiling speaker strobes. 2 duct detectors for hp with control relay for shutdown. ref #201705156627Heating and cooling$7,700—Finaled Sep 8, 2017201706219984
Jun 6, 2017otc alterations permit: 11th floor: title 24 mechanical to install 2 new fire smoke dampers, 2 new heat pumps and 5 new vavs and replace ductwork. please refer to app# 201705156627 for ti work. n/a for maherHeating and cooling$91,042—Finaled Oct 5, 2017201706058475
May 25, 2017otc alterations permit: t-24 electrical to install new lighting and power on 11th floor. ref app#201705156627 for t.i. n/a for maherElectrical$96,800—Finaled Sep 18, 2017201705257680
May 12, 2017otc alterations permit: 14th & 15th fl: fire alarm t.i. add smoke detector, duct detectors, wall speaker strobes, ceiling speaker strobes, weatherproof speaker strobes, relays, monitoring modules for generator, & relocate devices. ref: #2016-0212-9534Heating and cooling$10,000—Finaled Apr 20, 2018201705126459
Apr 14, 2017additions alterations or repairs: 14th & 15th floor. refer to pa# 2016/02/12/9534 for more information. demo 106 kw @ lower level & addition of new roof 275 kw life / safety generator (in sound & weather proof enclosure) with integral 200 gallons sub-base tank. ** maher: n/a **Roofing$600,000—issued201611031868
Apr 12, 2017otc alterations permit: phase 2 suite 700: mechanical and electrical permit for t.i. ref app#2017-0208-8934. n/a for maherElectrical$74,273—issued201703272406
Apr 12, 2017otc alterations permit: phase 1 suite 700: mechanical and electrical permit for t.i. ref app#201701106800. n/a for maherElectrical$400,000—issued201703272403
Mar 7, 2017otc alterations permit: 11th floor: remove extg electric strike hardware from extg frameless glass door and replace it with a magnetic lock and emergency push button release. n/a for maherElectrical$15,000—Finaled Jul 25, 2017201701318323
Mar 3, 2017otc alterations permit: revision to 201602129534. arch coordination of fuel oile pipe including fire rated through wall penetration. proviseions for 2 new fire rated rooms to isolate electrical equipment within existing space in basement. new access doors, slab to remain open, relocate elec equip rm frm 15th to 14th flElectrical$58,000—issued201702270215
Dec 27, 2016otc alterations permit: basement: change out 2 chillers and 3 boilers 1-hx ada new pumps maher naHeating and cooling$1,500,000—issued201612235803
Oct 17, 2016additions alterations or repairs: renovate 14th flr, including expansion onto mechanical roof wall, from a mechanical/maintenance space into a cold shell for leasing; move all mech/elec/plumbing systems from 14 to 15th/roof penthouse. plumbing & electrical are under separate permit. n/a for maher ordinance no 155-13Roofing$9,000,000—issued201602129534
Sep 1, 2016otc alterations permit: the demo scope will be done & reference to pending 201602129534.level 14: demo interior partition,mechanical,electrical & plmbg & louvers.level 15: demo interior partition,finishes & allow preparation for future work.some exterior wall,window & roofing to replace w/new materials; maher n/aRoofing$250,000—Finaled Nov 15, 2017201609016613
Jul 12, 2016otc alterations permit: mech plan submittal - install new transfer fan and associated ductwork to new mpoe room. 2 new fsd's with spot type detection. ref arch pa# 201605258294. electrical, plumbing, and fire under separate permits. n/a for maherPlumbing$8,000—issued201606170222
Jun 29, 2016otc alterations permit: eot new lighting, lighting controls, power for hvac equip, outlets and fire alarms for bike storage and locker rooms in basement, ref. bp 201508043283Heating and cooling$159,000—issued201606170261
Jun 24, 2016otc alterations permit: modification of hvac to match new layout. add 1 vav box w/controls and 2 exhaust fans with controls, air balance. ref pa 2016-0506-6816. maher naHeating and cooling$1—issued201606220589
May 27, 2016otc alterations permit: remove two extg heat pumps. rerout duct as needed fdor new floor plan. install 2 new heat pumps at same location as prevous heat pumps. ref app#201602179742Heating and cooling$76,815—Finaled Jun 9, 2016201605268533
May 27, 2016otc alterations permit: 2nd floor - as built fire alarm tenant improvement - install 2 duct detectors with housing & install 2 control relay modules. n/a maher ordinance ti 2016.0526.8533Heating and cooling$4,000—Finaled Jun 2, 2016201605066776
Mar 15, 2016otc alterations permit: 2nd floor: remodel extg office for new tenant. design bldg electrical, mechanical, life safety, and fire sprinkler permits pulled seperately. n/a for maherElectrical$240,000—Finaled Dec 30, 2016201602179742
Mar 11, 2016otc alterations permit: fire alarm t.i. add duct detector & relays for heat pumps & interposing relays. per mechanical drawing. ref mep app # 2015-0911-6698 arch app#2015-0408-3088. n/a maher ord. 155-13Heating and cooling$4,200—issued201603081457
Dec 29, 2015wall or painted sign: erect door/window non electrical sign. n/a for maherElectrical$4,000—issued201512235795
Dec 29, 2015sign - erect: erect doorwindow electric sign. n/a for maherElectrical$4,000—Finaled Mar 21, 2016201512235794
Sep 17, 2015otc alterations permit: revision to pa 2015 0408 3088: as builts for ti 201508174399, added 2 duct smoke detectors for fsd's - fire alarm system. maher naHeating and cooling$1,600—Finaled Oct 16, 2015201509177207
Sep 2, 2015otc alterations permit: for gr fl lobby of office building approx 2600 sq ft. includes new partitions, finishes, ceilings, guard station, light fixtures, no exterior work. no change to mech or plumb. fire protection sep permit. demo under sep permit. n/a meher ordinancePlumbing$490,000—Finaled Dec 7, 2016201508043281
Aug 4, 2015otc alterations permit: electrical and lighting title 24 to upgrade equipment and fixtures on 4th and 8th floor. t.i. 's please refer to app#201506158990 for the 4th floor and 201505168994 for the 8th floor. n/a for the maherElectrical$1,200,000—Finaled Mar 4, 2016201507292830
Jul 16, 2015otc alterations permit: revision to app#201502057641 to show swing door instead of automatic doors at entry to reflect what is approved swing doors. drawing change only to mep & electrical. n/a for maherElectrical$1—issued201507151530
Apr 28, 2015otc alterations permit: minor interior wall demo and construction. new automatic entry door. new interior finishes, relocate equip, data elec as req. new/relocated fixtures and interior graphices, limited ceiling/hvac changes based on demo. n/a ordinance #155-13Heating and cooling$80,000—Finaled Jul 20, 2015201502057641

On California St

1,706 permits on record on California St.

TradePermitsSince Oct 15, 2024Median declaredRangeLast
Roofing30550$21,590$8,880–$207,000Jul 20, 2026
Electrical537106$100,000$2,793–$850,000Oct 13, 2026
Heating and cooling51370$33,865$1,470–$385,794Sep 21, 2026
Plumbing32861$94,783$3,500–$735,000Oct 8, 2026
Solar144—under 5May 7, 2026
Water heater93—under 5Sep 4, 2026

Roof replacement cost in San Francisco

Across 5,756 one- and two-family reroof permits since October 15, 2024, most declared values run from $7,650 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,800 and $21,900. The lowest on record is $1 and the highest $4,315,170. Every permit behind that range.

Furnace, heat pump or air conditioner replacement cost in San Francisco

Across 294 one- and two-family heating and cooling permits since October 15, 2024, most declared values run from $31 to $247,000 (the middle 80%); the median is $26,000 and half fall between $5,125 and $124,285. The lowest on record is $1 and the highest $1,600,000. Every permit behind that range.

Source

San Francisco Department of Building Inspection, via DataSF, pulled nightly; the assessor roll for the property fields. As of October 15, 2026. Owner names are not shown on any page.