Permits Index

Home-service permits on record at this address

IssuedWorkTradeDeclared valueContractor as filedStatusPermit
Sep 24, 2026otc alterations permit: existing interior office remodel. scope includes demo and construction of non structural partitions, ceilings, glazing, finishes, electrical, mechanical and plumbing fixtures, new drinking foundation and single user restroomPlumbing$3,942,870—issued202609178254
Sep 24, 2026otc alterations permit: suit#1350: interior office remodel, scope includes demo & construction of non-structural partitions, ceilings, glazing, finishes, electrical, mechanical, & plumbing fixturesPlumbing$859,574—issued202608206891
Apr 27, 2026sign - erect: chanel letter sign, ext 001, electric, single faced, 2" thickness. "bank of america"Electrical$1,300—issued202604270158
Apr 27, 2026sign - erect: 2) aluminum plate letters, ext 002 & 003, non-electric, single faced sign, 3/16" thickness. "bank of america"Electrical$2,200—issued202604270155
Apr 14, 2026otc alterations permit: as-built ti: add smoke detectors and duct detectors. arch ref# 202510036672Heating and cooling$15,038—Finaled Jun 17, 2026202603248183
Feb 13, 2026otc alterations permit: 28th fl ref pa #2025-1003-6672: fire alarm ti. demo 1 relay mod 7 duct detectors 6 smoke detectors 8 ceiling speaker strobes. add 29 ceiling speakers 8 smoke detectors 8 duct detectors 11 relay mods 11 dual motor mods 15 rib relays 22 auxiliary relays pam 1 emergency door releaseHeating and cooling$95,780—Finaled Jun 17, 2026202602055354
Sep 5, 2025otc alterations permit: 26/f suite 2670: fire alarm tenant improvement. demo ceiling speaker, ceiling speaker strobes, smoke detector, duct detectors, relay module. install ceiling speaker/strobes, smoke detector. ref ti permit 202506279667Heating and cooling$6,485—Finaled Oct 10, 2025202509024395
Feb 21, 2025otc alterations permit: 35th fl - fire alarm ti. demo speaker/strobes, speakers, strobes, smokes, ducts install 33 speaker/strobes, 3 strobes, 6 duct detectors, 2 dual input modules, 1 power supply, 1 door release arch ref 202406265293Heating and cooling$44,000—Finaled Feb 28, 2025202502210753
Jan 8, 2025otc alterations permit: 36/fl- ti 202405222693 and 202407257297- fire alarm ti demo speaker/strobes. remove and replace w/ 5 speaker/strobe, 2 smoke detectors, duct detector, and emergency door release. relocate speaker/strobe install 34 speaker/strobe, 5 smokes, 6 strobesHeating and cooling$50,158—issued202411155127
Dec 13, 2024otc alterations permit: 35/f: fire alarm modification. ref pa 202406245061. demo 22 speakers, 20 strobes, 3 smoke detectors and 12 duct detectors. install 6 duct detectors, 10 rib relays, 10 dual monitor moduleHeating and cooling$26,585—Finaled Apr 29, 2025202411205415
Nov 19, 2024otc alterations permit: 35th floor: fire alarm t.i.: demo 3 speaker strobes, 22 strobes, 22 speakers, 6 smokes, 6 duct detectors, 4 door holders. install 33 speaker speaker/strobes, 3 strobes, 1 duct detectors, 2 dual input modules, 1 power supply, 1 door release. ref #202405222693/mech #202407257297Heating and cooling$52,303—Finaled Feb 28, 2025202411195289
Oct 16, 2024otc alterations permit: 24/f: mechanical and electrical work to support approved arch # 202409049993. office tiElectrical$230,724—issued202410152999
Sep 16, 2024otc alterations permit: 24th fl - dmo of non-structural partitions, millwork, finishes, ceiling, lighting and plumbing. construction of non-structural partitions, millwork, finishes, ceiling, lights and new partitions. no change in occupancy use or areaPlumbing$1,721,466—issued202409049993
Aug 2, 2024otc alterations permit: 31st fl fire t.i. - demo 10 speaker/strobes, 2 speakers, 1 smokes, 2 ducts, 2 relays, 2 emergency door release relocate/replace with new 17 speaker/strobes, 5 smokes. install new 5 speaker/strobes, 2 duct detectors, 1 smoke, 3 relays. arch ref pa# 202403157924Heating and cooling$34,419—Finaled Dec 9, 2024202407126356
Jul 12, 2024otc alterations permit: 35/f: demo non structural partitions, ceilings, millwork, electrical and mechanical, new elevator lobby doors to replace . emergency lighting and mechanical ab-17Electrical$84,000—issued202406245061
Apr 5, 2024otc alterations permit: 31/f: demolition of non-structural partitions, millwork, finishes, ceiling, lighting and plumbing. construction of non-structural partitions, millwork, finishes, ceiling, light, new demising partitions and non-rated common corridor. no change in occupancy, use or areaPlumbing$2,551,472—Finaled Apr 3, 2025202403157924
Feb 15, 2024otc alterations permit: 34th & 35th floors: t.i. 35th floor demo 12 ceilig spreaker strobes, 4 ceiling spreakers, 1 ceiling storbes, 2 smokes, 1 duct detectors, 1 heat detector, 2 relays. 34th floor:demo 3 ceiling speaker/strobes. demo permit pa# 20230615127Heating and cooling$5,000—issued202402155966
Oct 12, 2023otc alterations permit: 28/f: f/a t.i. demo ceiling speaker, wall strobes, smoke detectors, ducts. relocate smoke detectors, pull station. add ceiling speaker/strobes. ref permit 202306260808Heating and cooling$15,300—Finaled Sep 10, 2024202310118413
Aug 17, 2023otc alterations permit: 21/f ste# 2150 spec suite: tenant improvement, new non-structural paritions, doors, ceilings, millwork,hvac, plumbing, electrical, finishes and light fixturesHeating and cooling$1,309,680—Finaled Jul 2, 2024202304055082
Jun 29, 2023otc alterations permit: 28th fl - demo of partitions, ceilings, finishes and millwork; remodel of restrooms and elevator lobby. the space will remain unoccupied after this project. any future ti's will be under separate permit. no new plumbing fixturesPlumbing$469,000—Finaled Sep 11, 2024202306260808
May 30, 2023otc alterations permit: 10th fl: interior alterations. demo, ceiling grid, mill work, electrical and mechanicalElectrical$400,000—Finaled Jan 30, 2024202304185940
May 19, 2023otc alterations permit: 13th fl - ti consisting of new non-structural partitions, doors, ceiling, lights, millwork, finishes, electrical, plumbing and hvacHeating and cooling$1,938,674—Finaled Jul 2, 2024202303304700
Apr 4, 2023otc alterations permit: 21/f: fa modification: add 24 sprinklers/strobs, 1 strobe, 1 dual sync module, 1 smoke dtc, 2 duct dtc, 3 rib relays, 4 control relay, 2 mushroom push buttom door release, relocate 2 sprinkler/strobesHeating and cooling$28,000—issued202303214111
Feb 16, 2023otc alterations permit: 21/f: tenant improvement. new offices, reception, conference room, open work stations, new partitions - non load bearing, storefronts, ceilings, millwork, furniture, power/data and mechanical, electrical, and plumbing work. no structural workPlumbing$2,839,105—Finaled Jul 25, 2023202301301025
Jan 18, 2023otc alterations permit: 21st fl - construction of common corridor, elevator lobby and demising walls. scope includes non-structural walls, electrical outlets, floor and wall finishes, and light fixtures, alteration/addition of mep systems to creat warm shellElectrical$180,000—Finaled Jan 29, 2024202301130143
Nov 18, 2022otc alterations permit: ref pa# 202209065431. fls modification on 6/f: install sprinklers; strobes; smoke detector; duct detectors; rib relays; control relays; dual synch modules. relocate spkr/strobesHeating and cooling$25,000—issued202211166600
Oct 28, 2022otc alterations permit: this is an asbuilt permit for approved fls pa# 202207128236 & 20220953491. the changes are: update location of red phone , update address of duct detector & smoke detector; update strobe power supply as "existing", update voice messaging/announcementHeating and cooling$1,000—Finaled Nov 4, 2022202210285379
Sep 30, 2022otc alterations permit: ref pa# 2022-0712-8236: this is an as-built permit for pa# 2022-0712-8136, the only changes under this permit is to add 2 strobes synch module and to update the sprinkler/strobe, brand due to this change, the strobe voltage drop and battery calculations has been updatedSolar$840—Finaled Nov 15, 2022202209303491
Aug 29, 2022otc alterations permit: ref pa# 202204262977. 6/f fls modification: install 8 spkn/strobes, 7 s/d, 7 d/d, 22 pam -1; 11 rib relays, 11 dual monitor modules, 3 replace 2 duct det and 2 pull station and 5 smoke detector with newHeating and cooling$35,000—Finaled Oct 24, 2023202208231044
Aug 23, 2022otc alterations permit: ref pa# 202204262977. 6/f fls modification: install 8 spk/strobes, 7 s/d, 7 d/d, 22 pam -1, 11 rib relays, 11 dual monitor modules, 3 ctrl relays, 1 power supply, 1 nac mod, replace 2 duct det and 2 pull station with newHeating and cooling$51,538—Finaled Sep 8, 2023202208231043
Jul 21, 2022otc alterations permit: 23/f: fa addition: fa modification - add spkr/strbs, strbs, spkn det, duct det, rib relays, pam-1, monitor mods, control relays, emergency door rlease, replace rps, relocate spkr/strbs, smoke det, duct detectorHeating and cooling$38,000—Finaled Nov 4, 2022202207128236
Jun 6, 2022otc alterations permit: demo of non struc partitions, millwk, power/data, plumbing, ceiling systems incl abatement of haz materials. removal of interconnect stair and slab infill. build back of accessible restrooms and mep to warm sheel condition space will remain unoccupied. add 11 fsds & 127 upright sprinkler headsPlumbing$160,000—Finaled Feb 8, 2024202206025434
Jun 6, 2022otc alterations permit: 6/f: demo of non-structural partioins, millwork , power/data, plumbing and celing systems including rmeoval of hazadous matz on unoccupied full floor. build back of multi-occupant restrooms and mep systems to warm shell condition.future ti sep permit. ab-017. maher n/aPlumbing$160,000—Finaled Sep 8, 2023202204262977
Feb 25, 2022otc alterations permit: 23rd fl: fire alarm modification. demo devices in tenant space. install 8 speaker/strobes, 6 smoke detectors, 6 duct detectors, 10 rib relays, 10 pam-1 relays, 10 dual monitor modules, 2 cntr relays. replace 2 duct detectors & 2 pull stations. ref pa# 202110080093Heating and cooling$28,726—Finaled Jul 13, 2022202202258712
Oct 20, 2021otc alterations permit: 23rd floor:revision to bpa#202107214842. new restroom, const of non struct walls, plumb, fixtures & restroom accessories & elec outlets as well as new floor & walls finishes & light fixtures on unocupied floor. add of mep systems to warm shell conditionPlumbing$70,000—Finaled Aug 12, 2022202110080093
Jul 30, 2021otc alterations permit: demo of non-structural partitions, power/data, millwork, plumbing & ceilling systems including removal of hazardous materials on an unoccupied fl. space will remain unoccupied, any future bulid outs will be under a sep permit at which time accessibilit documentaion will be providedPlumbing$100,000—Finaled Aug 12, 2022202107214842
May 13, 2021otc alterations permit: ref pa 2020-1217-1240 ; 2020-1217-1216 ; 2020-1217-1247 ; f/a addition on 11/f & 12/f; add spkrs/strbs; strobes; smk detectors; door holders; emergency door release; cntrl rlys; monitor modules; duct detectors; strobe power supply; cnHeating and cooling$80,630—Finaled Aug 4, 2021202105110163
Mar 31, 2021otc alterations permit: 11th and 12th floor restroom upgrade: selective demolition of finishes, restroom plumbing fixtures & accessories & lighting. construction of non-structural partitions, plumbing & electrical fixtures & all finishes. no change in occupancy, use, or areaPlumbing$352,776—Finaled Dec 27, 2021202012161094
Mar 25, 2021otc alterations permit: suite #200: deferred mechanical & electrical. upgrades to electrical and mechanical systems. added power requirements. ti reference pa #2020-0926-5160Electrical$30,000—issued202012020074
Mar 11, 2021otc alterations permit: ref demo permit 2020-1019-6863. 11th floor: change out one hundred and thirty nine sprinklers 12th floor: change out one hundred and thirty nine sprinklersHeating and cooling$151,600—issued202010297790
Feb 16, 2021otc alterations permit: 4/f: deferred mechanical & electrical work for t.i. ref pa 202010025766 maher n/aElectrical$120,000—issued202011128765
Jan 8, 2021otc alterations permit: 11/f & 12/f: selectrive demo of non-load bearing partitions, celings, light fixtures, millwork, finishes, electrical and plumbing. abatement of haz mat as indicated. maher n/a. (sprinkler ti for this project submitted under 2020-1029Plumbing$247,572—issued202010196863
Nov 9, 2020otc alterations permit: suite 200: demo of non-structural partitions, doors, millwork, finishes, electrical and plumbing. new non-strutural partitions, doors, glazing, electrical & finishes. no change in occupany or use. no floor area increases. maher n/aPlumbing$127,100—issued202009265160
Sep 9, 2020otc alterations permit: ref# 202007099908; f/a mod on 33rd fl: remove devices in sheet f8.1. replace 2 pull stations, 2 duct detectors; add 45 spkr/strbs; 1 spkr; 16 smk det; 6 control relays; 1 strobe power supply; 1 control module; 5 door holders; 3 emergency door release; 6 duct detectors; 23 rib; 11 monitor moduleHeating and cooling$57,260—Finaled Nov 18, 2020202009013147
Dec 19, 2019otc alterations permit: 33rd fl: demo of e non-struc partitions, power/data, millwork, plumbing & ceiling systems including removal of hazardous materials on an unoccupied full fl. space will remain unoccupied. any future buildouts will be under a sep permit. per ab-017. no change to use, occupancy, or sf. maher naPlumbing$114,120—Finaled Dec 7, 2020201912179723
Oct 8, 2019otc alterations permit: revision to pa # 2019-0703-5113: addendum to electrical drawings eld-425, el-425, epd-425, ep-425Electrical$1—Finaled Feb 28, 2020201910043553
Oct 4, 2019otc alterations permit: 34th fl - remove & replace 1 water source heat pump with like for like unit. reconnect to existing power, condenser water supply and return and condensate connectionsHeating and cooling$8,700—Finaled Mar 4, 2020201910043554
Jun 14, 2019otc alterations permit: 13th fl - ti of office - replace all interior finishes & furniture, ceiling & tiles, electricalElectrical$267,000—Finaled Sep 3, 2019201906032238
Jan 16, 2019otc alterations permit: t-24 - mechanical & electrical for work under pa #201812117945. 27th fl. maher naElectrical$3,000—issued201901160533
Nov 16, 2018otc alterations permit: ref pa# 201810102728; drawings to suppoprt previously approved architechual set. includes the installation of duct work and equipmentHeating and cooling$45,000—Finaled Aug 6, 2019201811145826
Aug 28, 2018otc alterations permit: 18th fl f/a modification - replace 1 strobe power supply; relocate 4 speakers/strobes; add 30 speaker/strobes; 11 strobes; 4 smoke detecros; 3 control relays; 1 dual monitor module; 10 rib relays; 3 emergency door release; 2 door holders; 4 duct detectorsHeating and cooling$37,810—Finaled Sep 18, 2018201808288487
Aug 24, 2018otc alterations permit: 18th fl l- replace 6 speaker strobes; 5 smoke detectors 1 nac module. install 11 dual monitor modules; 11 rib relays; 2 smoke detectors; 7 duct detectors; 1 speaker/strobes; 2 control relays; 2 pull stations. ref pa 2018-0208-0808Heating and cooling$24,070—Finaled Sep 18, 2018201808238091
May 16, 2018otc alterations permit: interior tenant renovation of 18th fl. lobby, open office and comf. rms. including new partitions, finishes & lighting, mech, elec, plumbing and fire protectionPlumbing$2,500,000—Finaled Apr 4, 2019201805108789
Apr 17, 2018otc alterations permit: electrical lighting plans and title 24 certificates of compliance only; reference p.a. #201803143593; change rcp to accurately rflect exsting condidionsElectrical$50,000—Finaled May 15, 2018201803143593
Mar 16, 2018otc alterations permit: f.a. modification on 31st floor, install duct detectors for the heat pump, rib relays control relay; control relay, aadc1 analog loop condHeating and cooling$5,192—Finaled Apr 23, 2018201803163833
Feb 1, 2018otc alterations permit: 31 st flr - installation of 2 new heat pumps, minor ceiling removal/reinstallation, control commissioning maher na ref pa 201411050746Heating and cooling$203,000—Finaled Jan 25, 2019201802010089
Jan 30, 2018otc alterations permit: mechanical and electrical work for ti 1 vav box relocate supply grilles. new lighting and electrical. ref pa 2017-1117-4223Electrical$60,000—issued201801309851
Dec 13, 2017otc alterations permit: tenant improvement on the 4th floor to include demolition; new partitions, doors , finishes, ceilings. mechanical & electrical under sepaarate prermitElectrical$200,000—Finaled Jan 9, 2019201711174223
Nov 1, 2017otc alterations permit: 35th fl - selective demo of non structural partitions, doors, glazing, hardware, millwork, lighting, ceiling grid & tile, electrical & finishes. new non-structrual partitions, doors, hardware, glazing, finishes & relocation of lighting & electrical. no structural. mep under separate permitElectrical$110,234—Finaled Jan 11, 2018201710161291
Aug 18, 2017otc alterations permit: ref ti 2016-1031-1476 and mech 2017-0614-9313 fire alarm modification on 19th fl; install 35 speaker/strobes, 2 speakers, 5 smoke detectors; 9 duct detectors; 3 control relays; 15 pilot relays; 11 dual monitor modules; 2 emergency door release; 1 slv loop drivers; 1 battery cab; 2 facp batteriesSolar$45,000—Finaled Nov 15, 2017201707242677
Jul 24, 2017otc alterations permit: ref ti 2017-0510-6188, fire alarm modification on 1st floor: install speaker/strobes; smoke detector; duct detector; control relay. remove 1 ceiling mount speaker/strobe. maher naHeating and cooling$4,000—Finaled Aug 11, 2017201707242675
Jun 20, 2017otc alterations permit: mechanical, electrical & plumbing work for ti on the 19th floor. ref pa 2017-0607-8670Plumbing$200,000—issued201706149313
Jun 19, 2017otc alterations permit: ground floor - install new walls, doors & casework, equipments: install new rest room; install new ceiling & lighting modify mechanical; electrical & plumbing; install new floor, ceiling, wall finishes. no exterior work. signage & fire sprinkler/alarm under separate permit. n/a for maherPlumbing$300,000—issued201705106188
Jun 6, 2017otc alterations permit: 17th floor - fire alarm modification - add 1 control relay; 2 duct detectors and 2 rib relays. ref pa 2017-0224-0109. n/a maher ordinanceHeating and cooling$2,700—issued201706068500
Mar 9, 2017otc alterations permit: 17th flr -selective demolition of finishes & plumbing fixtures. new construction consists of non-structural partitions, restroom fixtures, accessories & finishes. all within common areas only. tenant improvement under separate permit. space is occupied & will remain occupied during project.n/a maherPlumbing$160,000—Finaled May 10, 2017201702280229
Mar 6, 2017otc alterations permit: 17th floor: t.i. to demo and construct new partitions, doors, millwork, ceiling and finishes and mechanical and electrical equipment. life safty and fire under seperate permit. n/a for maherElectrical$800,000—Finaled Jul 24, 2017201702240109
Feb 28, 2017otc alterations permit: 4th flr, ste 450: demo 1 ceiling speaker/strobe, add 2 new ceiling speaker/strobes, add 1 new smoke detector for idf room. add 2 new duct detectors for 2 new heat pumps. add 1 control relay for the heat pumps to shut down. ref 201612215612 maher naHeating and cooling$2,500—Finaled Apr 24, 2017201702280338
Feb 13, 2017otc alterations permit: suite 450 tenant improvement of non-structural walls, modify lighting & patch finishes includes mech + electrical. sprinkler + life safety are deferredElectrical$210,000—Finaled Jun 23, 2017201612215612
Dec 7, 2016otc alterations permit: 19/f- selective demo of non structural partitions, doors, glazing, hardware, millwork, lighting, ceiling grid & tile, electrical & finishes. new work consists non structural partitions, elevator lobby doors, restroom fixtures/accessories/finishes, space remain unoccupied. ti will follow. n/a maherElectrical$155,000—Finaled Mar 14, 2017201610311476
Jun 22, 2016otc alterations permit: t.i. of existing occupied office space, limited partition demolition, new partitions, replacement of existing suite entry doors, new office door, new finishes, new electrical, limited ceiling work & millwork. sprinkler & life safety under seperate permit. n/a ordinance #155-13Electrical$1,000,000—Finaled Dec 21, 2016201606150018
Apr 6, 2016sign - erect: install illuminated electric single faced wall sign. t.i. pa#201603031055. n/a ordinance #155-13Electrical$5,000—issued201604043853
Mar 17, 2016otc alterations permit: relocate 2 extg atms, relocate one night depository, construct new interior partition, infill portion of storefront. relocate electrical receptacles. n/a for maherElectrical$23,000—Finaled May 25, 2016201603031055
Feb 2, 2016otc alterations permit: roof: tenant cooling tower replacement. maher naRoofing$1,020,000—Finaled Jun 6, 2016201601217609
Jan 25, 2016otc alterations permit: 10th flr: fa modification: add 10 speaker/strobes, 11 speakers, 20 strobes. upgrade 1 strone power suply, add 4 duct detectors at heat pump add 4 pilot relays, add 1 conrol relay for heat pump add 4 duct holders. referenced ti 2015.1124.3474 maher naHeating and cooling$28,270—Finaled Nov 1, 2016201601227729
Jan 7, 2016otc alterations permit: 30th floor: ref t.i. app#201511102250: fire alarm modification. install 9 speaker/strobes, 2 duct detectors, 4 rib relays, remove one speaker/strobes,relocate 4 speaker/strobes and one smoke det. inside idf room. n/a for maherHeating and cooling$10,280—issued201601076541
Dec 10, 2015otc alterations permit: demolition of 10/f existing walls, ceiling, lighting, electrical and finishes. new non-load bearing walls, restrooms, doors, ceiling, lighting, electrical, finish and furnishing. n/a ordinance #155-13Electrical$3,500,000—Finaled Oct 31, 2016201511243474
Nov 30, 2015otc alterations permit: new non structural partitions, lighting, electrical, finishes, millwork. no change in occupancy or use, or area. n/a for maherElectrical$700,000—Finaled Mar 11, 2016201511102250
Oct 23, 2015otc alterations permit: 13th floor: title 24 - electrical work for ref pa 2015-0914-6891 maher naElectrical$9,360—Finaled Jan 7, 2016201510230647
Aug 5, 2015otc alterations permit: 29th floor suite 2950 - title 24 electrical. 201507091084. 6 new power outlets with room 4 power controller, 7 data outlets, 4 new dimmers switches, 4 daylights sensors. n/a maher ordinanceElectrical$35,360—issued201508053425
Aug 3, 2015sign - erect: erect a non-electric single faced wall sign; maher n/aElectrical$5,000—issued201507312984
Jul 28, 2015otc alterations permit: fire alarm modification on 32nd: 19 speaker/strobe, 2 duct detectors, 1 smoke det, 4 control relays, 8 rib relays, 1 emergency room release, 2 door holder, relocate 5 speaker strobes. maher naHeating and cooling$19,000—Finaled Sep 16, 2015201507282607
Jul 17, 2015otc alterations permit: 29th floor: t.i. include demo of non-structural partion, build new non-structural partitions, doors, lights, electrical and hvac. no change in occupancy or sq. footage. mep under separate permit. maher n/a. life safety deferredHeating and cooling$70,000—Finaled Sep 30, 2015201507091084
Jun 30, 2015otc alterations permit: 3rd flr: f.a. t.i. fir install pilot relays, control relay smoke sensors(31 speaker/strobes remote power booster emergency door release buttons door holders duct/smoke detectors,ref. 201504163857; maher n/aHeating and cooling$27,000—Finaled Jul 30, 2015201506300271
Jun 30, 2015otc alterations permit: 27th flr: fa t.i. install pilot relays, control relay smoke detector speaker/strobes speakers, duct/smoke detector; maher n/aHeating and cooling$11,308—Finaled Oct 16, 2015201506300270
Jun 26, 2015otc alterations permit: 30th floor: f.a. t.i. add 15 speaker/strobe, upgrade 1 remote power supply, add 1 smoke detector, add 3 duct detector, add 3 ribu1c, add 1 slc loop card, add 1 battery enclosure with 2 batteries. n/a for maher. ref 201503312412Solar$13,878—Finaled Jul 23, 2015201506260026
Jun 25, 2015otc alterations permit: electrical and mechanical work for ti on 5th fl. maher not reqElectrical$30,000—Finaled Jan 19, 2016201505287334
Jun 23, 2015otc alterations permit: built ti 201503039789, abatement of 32fl, 16 speaker/strobes, 11 duct detectors, 7 smoke det, 2 pull stations, 4 door holders, 2 control relays, 17 accessor relays, 11 dual monitor modules, 1 storbe power booster with 2 batteries, 1 conrol mod,1 loop card. n/a ordinance #155-13Heating and cooling$1—Finaled Jul 9, 2015201506239612
Jun 19, 2015otc alterations permit: 32nd fl: partitions, non-structural ceiling, lights, electrical, finshes, millwork, mep. no change in area, occupancy or use or use. maher not req. deferred submittals - stuctural for roll-up door and sliding glass doors and for life safetyElectrical$1,920,471—Finaled Jan 19, 2016201506088329
Jun 9, 2015sign - erect: erect one illuminate address channel electrical sign n/a for maherElectrical$3,000—issued201506058209
Mar 23, 2015otc alterations permit: add speakers/strobes, speakers, smoke detector, duct detectors, control relay, ribs, relocate speaker/strobes. t.i. pa#201501236564. n/a ordinance #155-13Heating and cooling$18,000—Finaled Apr 14, 2015201503039787
Mar 12, 2015otc alterations permit: add speakers/strobes, door holders, strobe power supply, duct detectors, control relays, control module, smoke detectors, rib's, dsdc-1 digital loop card, pull stations, monitor modules. demo pa#201501165960, no t.i. submitted. n/a ordinance #155-13Heating and cooling$50,000—Finaled Jul 1, 2015201503039789
Mar 5, 2015otc alterations permit: add speakers/strobes, speakers, smoke detector, dual monitor modules, duct detectors, control relay, rib relay, relocate speaker/strobes. t.i. pa#201412184046. n/a ordinance #155-13Heating and cooling$14,000—Finaled May 1, 2015201503039786
Feb 18, 2015otc alterations permit: 32nd floor - remove hazardous material from current unoccupied space full floor and includes demo of non-sturctural partitions, power/data, millwork, plumbing and ceiling. new work consists of restroom build back and elevator enclosure. space remain unoccupied. t.i.under sep. permit.maher n/aPlumbing$1,500,000—Finaled Aug 21, 2015201501165960
Feb 4, 2015otc alterations permit: 30th floor - non-structural partitions, ceil, lighting, electrical, finishes, millwrok. no change in occupancy, use or areaElectrical$861,100—Finaled Aug 13, 2015201501307072
Jan 27, 2015otc alterations permit: 29th floor - mech, elect, plumb work for partial floor t.i. - to install new equipment. refer to pa #2015.0123.6564. n/a maher ordinancePlumbing$540,000—Finaled Aug 7, 2015201501276748

On California St

1,705 permits on record on California St.

TradePermitsSince Oct 14, 2024Median declaredRangeLast
Roofing30550$21,590$8,880–$207,000Jul 20, 2026
Electrical536105$100,000$3,000–$860,000Oct 8, 2026
Heating and cooling51370$33,865$1,470–$385,794Sep 21, 2026
Plumbing32861$94,783$3,500–$735,000Oct 8, 2026
Solar144—under 5May 7, 2026
Water heater93—under 5Sep 4, 2026

Roof replacement cost in San Francisco

Across 5,764 one- and two-family reroof permits since October 14, 2024, most declared values run from $7,650 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,800 and $21,900. The lowest on record is $1 and the highest $4,315,170. Every permit behind that range.

Furnace, heat pump or air conditioner replacement cost in San Francisco

Across 292 one- and two-family heating and cooling permits since October 14, 2024, most declared values run from $11 to $229,462 (the middle 80%); the median is $25,998 and half fall between $5,000 and $120,125. The lowest on record is $1 and the highest $1,600,000. Every permit behind that range.

Source

San Francisco Department of Building Inspection, via DataSF, pulled nightly; the assessor roll for the property fields. As of October 14, 2026. Owner names are not shown on any page.