Permits Index
2
Permits, 24 months
5 on record
3
Roofing permits
Mar 28, 2025
Last permit issued
5
Addresses with a page

Roofing: 3 permits

From May 16, 2024 to Mar 28, 2025. Fewer than 5 roofing permits since October 1, 2024 carry a declared value, so no range is computed; the rows are below. Filed by NOT GIVEN (3).

IssuedWorkBuildingDeclared valueContractor as filedPermit
Mar 28, 2025Roof/Re-Roof: RE-ROOF PER CMC MARCH 2025 PERMIT REPORTResidential$13,458NOT GIVEN25-03-01519
Mar 17, 2025Roof/Re-Roof: RE-ROOF PER CMC MARCH 2025 PERMIT REPORTResidential$13,500NOT GIVEN25-03-01249
May 16, 2024Roof/Re-Roof: REROOF PER 5/24 PERMIT REPORTResidential$14,000NOT GIVEN24-05-02522

Plumbing: 1 permit

From Apr 12, 2024 to Apr 12, 2024. Fewer than 5 plumbing permits since October 1, 2024 carry a declared value, so no range is computed; the rows are below. Filed by NOT GIVEN.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Apr 12, 2024Miscellaneous: SPOT REPAIR SEWER THROUGH TUNNEL UP TO 35' PER 4/24 PERMIT REPORTResidential$15,400NOT GIVEN24-04-01850

Heating and cooling: 1 permit

From Apr 6, 2023 to Apr 6, 2023. Fewer than 5 heating and cooling permits since October 1, 2024 carry a declared value, so no range is computed; the rows are below. Filed by NOT GIVEN.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Apr 6, 2023Demolition of Structure: DEMO AND REPLACE THE INSIDE DRYWALL, INSULATION, TILE, FIXTURES, PLUMBING, ELEC, HVAC PER APRIL PERMIT REPORTResidential$200,000NOT GIVEN23-0711

Addresses on this street with a page

Source

Collin Central Appraisal District building permits, Texas open data, pulled nightly. As of October 1, 2026. Storm dates touching this street will appear here once the hail record is attached.