Permits Index
3
Permits, 24 months
5 on record
0
Roofing permits
Jun 29, 2026
Last permit issued
5
Addresses with a page

Heating and cooling: 3 permits

From Apr 18, 2024 to Apr 7, 2025. Fewer than 5 heating and cooling permits since October 1, 2024 carry a declared value, so no range is computed; the rows are below. Filed by NOT GIVEN (3).

IssuedWorkBuildingDeclared valueContractor as filedPermit
Apr 7, 2025Miscellaneous: CHANGE OUT CONDENSER AND EVAPORATOR, PER APRIL 2025 CMC PERMIT REPORTResidential$7,600NOT GIVEN25-04-01630
Aug 21, 2024Miscellaneous: MECHANICAL- INSTALLATION OF A FURNACE PER 8/24 PERMIT REPORTResidential$5,400NOT GIVEN24-08-04290
Apr 18, 2024Miscellaneous: MECHANICAL- CHANGE OUT SPLIT SYSTEM PER 4/24 PERMIT REPORTResidential$12,900NOT GIVEN24-04-01983

Electrical: 1 permit

From Jun 29, 2026 to Jun 29, 2026. Fewer than 5 electrical permits since October 1, 2024 carry a declared value, so no range is computed; the rows are below. Filed by NOT GIVEN.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Jun 29, 2026Miscellaneous: DETACHED PATIO COVER W/ ELECTRICAL PER CMC JUNE 2026 PERMIT REPORTResidential$50,000NOT GIVEN26-06-03074

Solar: 1 permit

From Mar 7, 2025 to Mar 7, 2025. Fewer than 5 solar permits since October 1, 2024 carry a declared value, so no range is computed; the rows are below. Filed by NOT GIVEN.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Mar 7, 2025Solar Energy Device: INSTALLATION OF A 8.610KW ROOF MOUNTED PV SYSTEM W/ 2 TESLA POWERWALL 3 BATTERY PER CMC MARCH 2025 PERMIT REPORTResidential$53,462NOT GIVEN25-02-00025

Addresses on this street with a page

Source

Collin Central Appraisal District building permits, Texas open data, pulled nightly. As of October 1, 2026. Storm dates touching this street will appear here once the hail record is attached.