10
Permits, 24 months
15 on record
8
Roofing permits
Jul 2, 2026
Last permit issued
12
Addresses with a page

Roofing: 8 permits

From Jul 21, 2023 to Nov 3, 2025. Fewer than 5 roofing permits since October 1, 2024 carry a declared value, so no range is computed; the rows are below. Filed by NOT GIVEN (4), NOT LISTED, REROOF W/ NEW RTUs & GAS LINES.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Nov 3, 2025Roof/Re-Roof: RE-ROOF PER CMC NOVEMBER 2025 PERMIT REPORTResidential$130,000NOT GIVEN2025-11-05591
May 28, 2025Roof/Re-Roof: PER MAY 2025 MCKINNEY PERMIT REPORT: REROOFResidential$40,300NOT LISTEDRES2025-05-02633
May 15, 2025Roof/Re-Roof: PER MAY 2025 PERMIT REPORTCommercial$227,993REROOF W/ NEW RTUs & GAS LINES25-05-00564
Aug 26, 2024Roof/Re-Roof: REROOF PER 8/24 PERMIT REPORTResidential$15,500NOT GIVEN24-08-04372
Jul 17, 2024Roof/Re-Roof: REROOF PER 7/24 PERMIT REPORTResidential—NOT GIVEN24-07-03663
Feb 14, 2024Roof/Re-Roof: REROOF PER 2/24 PERMIT REPORTResidential$14,300NOT GIVEN24-02-00798
Aug 14, 2023Roof/Re-Roof: RE-ROOF PER AUGUST 2023 CMC PERMITResidential——23-04164
Jul 21, 2023Roof/Re-Roof: RE-ROOF PER JULY 2023 CMC PERMITResidential——23-03643

Heating and cooling: 5 permits

From Oct 2, 2024 to Jul 2, 2026. Across 5 heating and cooling permits since October 1, 2024, most declared values run from $8,229 to $22,285 (the middle 80%); the median is $14,600 and half fall between $9,773 and $20,601. The lowest on record is $7,200 and the highest $23,407. Filed by NOT GIVEN (4).

IssuedWorkBuildingDeclared valueContractor as filedPermit
Jul 2, 2026Miscellaneous: HVAC CHANGEOUT PER CMC JULY 2026 PERMIT REPORTResidential$14,600NOT GIVEN26-07-03590
Jun 23, 2026Miscellaneous: REPLACE COMPLETE HVAC SYSTEM PER CMC JUNE 2026 PERMIT REPORTResidential$20,601NOT GIVEN26-06-03369
Jul 8, 2025Miscellaneous: CHANGE OUT CONDENSER AND EVAPORATOR PER JULY PERMIT REPORTResidential$7,200—25-03419
Jun 23, 2025Miscellaneous: REPLACE COMPLETE HVAC SYSTEM, PER JUNE 2025 CMC PERMIT REPORTResidential$9,773NOT GIVEN25-06-03186
Oct 2, 2024Miscellaneous: MECHANICAL- REPLACE COMPLETE HVAC SYSTEM PER 10/24 PERMIT REPORTResidential$23,407NOT GIVEN24-10-05028

Plumbing: 1 permit

From Sep 18, 2025 to Sep 18, 2025. Fewer than 5 plumbing permits since October 1, 2024 carry a declared value, so no range is computed; the rows are below. Filed by NOT GIVEN.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Sep 18, 2025Miscellaneous: PLUMBING - TUNNEL 12 FT UNDER SLAB TO REPAIR SEWER LINE PER CMC SEPTEMBER 2025 PERMIT REPORTResidential$6,000NOT GIVEN2025-09-04650

Electrical: 1 permit

From Aug 11, 2025 to Aug 11, 2025. Fewer than 5 electrical permits since October 1, 2024 carry a declared value, so no range is computed; the rows are below. Filed by NOT GIVEN.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Aug 11, 2025Addition to Existing Structure: REBUILD EXISITNG DECK AND ADD COVERED PATIO COVER WITH ELECTRICAL, PER AUG 2025 CMC PERMIT REPORTResidential$45,000NOT GIVEN25-07-03637

Addresses on this street with a page