Permits Index
3
Permits, 24 months
3 on record
2
Roofing permits
Jun 24, 2026
Last permit issued
2
Addresses with a page

Roofing: 2 permits

From Aug 8, 2025 to Sep 11, 2025. Fewer than 5 roofing permits since October 1, 2024 carry a declared value, so no range is computed; the rows are below. Filed by NOT GIVEN (2).

IssuedWorkBuildingDeclared valueContractor as filedPermit
Sep 11, 2025Roof/Re-Roof: REMOVE CURRENT ROOFING SYSTEM DOWN TO DECKING, PER SEPT 2025 CPN PERMIT REPORTResidential—NOT GIVEN25-11605
Aug 8, 2025Roof/Re-Roof: REROOF DUE TO STORM DAMAGE, PER CPN AUG 2025 PERMIT REPORTResidential—NOT GIVEN25-11210

Solar: 1 permit

From Jun 24, 2026 to Jun 24, 2026. Fewer than 5 solar permits since October 1, 2024 carry a declared value, so no range is computed; the rows are below.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Jun 24, 2026Solar Energy Device: SOLAR INSTALL-NOT TYING TO EXISTING SYSTEM PER JUNE PERMIT REPORTResidential——26-14349